We installed suspended Absorbers, Raft Panels & a Wall liner system (Curved) to control the Reverberation Time (RT) within lecture theatres at Anglia Ruskin University in Cambridge.
Project Details
Client: Anglia Ruskin University, Cambridge
Project Specification: Educational studies
